Bloki ya gorofa, Aallonhuippu 8
02320 Espoo, Kivenlahti
Tafadhali wasiliana na mwakilishi wa mauzo kwa maelezo zaidi juu ya mali hii.
Leena Ginman
Wakala wa mali isiyohamishika
Habita Helsinki
Uhitimu wa mali isiyohamishika ya Kifini.
Bei ya kuuza ambayo haijazidishwa
€ 226,120 (TSh 557,889,960)Vyumba
3Vyumba vya kulala
2Bafu
1Mahali pa kuishi
78 m²Maelezo ya kimsingi
Namba ya kuorodhesha | 663232 |
---|---|
Bei ya kuuza ambayo haijazidishwa | € 226,120 (TSh 557,889,960) |
Bei ya kuuza | € 144,491 (TSh 356,492,474) |
Gawio ya dhima | € 81,629 (TSh 201,397,486) |
Gawio katika dhima inaweza kulipwa. | Ndio |
Vyumba | 3 |
Vyumba vya kulala | 2 |
Bafu | 1 |
Vyoo | 1 |
Bafu pamoja na choo | 1 |
Mahali pa kuishi | 78 m² |
Vipimo vimehalalishwa | Hapana |
Vipimo vimepimwa na | Nakala ya chama |
Sakafu | 3 |
Sakafu za makazi | 1 |
Hali | Inatosheleza |
Pa kuegeza gari | Nafasi ya kuegesha gari , Nafasi ya kuegesha gari yenye kutumia umeme |
Nafasi |
Chumba cha kulala Jikoni Sebule Msalani Bafu Roshani iliong’aa |
Mitizamo | Ua, Upande wa mbele, Ua la ndani |
Hifadhi | Kabati , Chumba cha msingi cha uhifadhi |
Mawasiliano ya simu | Runinga ya kebol, Mtandao wa kebol |
Nyuso za sakafu | Paroko, Lamoni, Koki |
Nyuso za ukuta | Rangi |
Nyuso za bafu | Taili |
Vifaa vya jikoni | Stovu la induction , Jokofu, Friza, Kabati, Hudi la jikoni, Mashine ya kuosha vyombo, Oveni tofauti, Microwevu |
Vifaa vya bafu | Shawa, Kiunganishi cha mashine ya kuosha , Kupashajoto kwachini ya sakafu, Nafasi ya mashine ya kuosha, Shawa ya bidet, Kabati, Sinki, Ukuta wa shawa, Kiti cha msalani, Kabati yenye kioo |
Kukaguliwa |
Tathmini ya hali
(8 Jul 2022) Tathmini ya hali (7 Okt 2009) Tathmini ya hali (2 Okt 2009) Tathmini ya hali (2 Des 2003) |
Uchunguzi wa Asbesto | Jengo hilo lilijengwa kabla ya 1994 na uchunguzi wa asbestosi haujafanywa. |
Hisa | 3988-4143 |
Maelezo ya ujenzi na mali
Mwaka wa ujenzi | 1972 |
---|---|
Uzinduzi | 1973 |
Sakafu | 3 |
Lifti | Hapana |
Aina ya paa | Paa la gorofa |
Uingizaji hewa | Uingizaji hewa wa mitambo |
Darasa la cheti cha nishati | F , 2013 |
Kutia joto | Kutia joto kwa wilaya |
Vifaa vya ujenzi | Saruji |
Nyenzo za paa | Kujaza |
Marekebisho |
Mpango wa ukarabati 2024 (Imemalizika) Bomba 2024 (Imemalizika), Pipe renovation is ready. The renovation includes the basic repair of pipelines (domestic water pipes, sewers, and rainwater drains), necessary structural repairs (bathrooms, WCs, kitchens), as well as electrical and telecommunications systems. Paa 2022 (Imemalizika), oof condition assessment and patch repairs. In 2015, the condition of the roofs and roof rainwater drains was inspected. In 1996, the roofing felt insulation was replaced. Uingizaji hewa 2021 (Imemalizika), Replacement of fresh air vent filters. In 2018, replacement of the exhaust fan in building C and adjustment of air volumes. In 2017, measurement and adjustment of exhaust ventilation in apartments of D and E stairwells. In 2015, replacement of exhaust fans in buildings D and E. In 2014, cleaning of the exhaust ventilation system and measurement and adjustment of air volumes Madirisha 2021 (Imemalizika), Repair and adjustment of window locks. Fakedi 2019 (Imemalizika), Replacement of the paneling on the west facade of building A-B and replacement or patch repair of individual damaged panels on other buildings. In 2013, repair of facade corner elements. In 2007, repair of cracks in facade panels. In 2002, warranty repairs of facades and adjustment of screw fastenings away from the edges of the panels. In 1998, additional insulation and paneling of facades. Roshani 2018 (Imemalizika), Warranty repairs of balcony doors and windows. In 2017, warranty inspection and thermal imaging of balcony walls, windows, and doors. In 2015, replacement of balcony windows, doors, and back walls. In 2009, replacement of wooden parts of balcony roof eave structures. In 2006, adjustment repairs of balcony doors. In 1998, sandblasting and plaster repairs of balconies. Zingine 2018 (Imemalizika), Replacement of civil defense shelter equipment and airtightness test of the shelter. Fire safety inspection and update of the emergency plan. Ghorofa 2017 (Imemalizika), Maintenance painting of steel doors in the basement. In 2015, installation of LED lighting in stairwells and other company premises. In 2012, replacement of stairwell doors and related structures, and addition of code locks. Uwanja 2016 (Imemalizika), Participation in the costs of renovating the parking area in cooperation with other companies using the area. In 2014, raising the manholes of sewers and rainwater drains to ground level. In 2013, flushing and inspection of rainwater drains and sewers on the property. In 2011, resurfacing and electrical system renewal of the parking area. Renovation of yard furniture. In 2004, construction of concrete paving in front of entrances. In 1994, asphalting of pathways. Maeneo ya kawaida 2015 (Imemalizika), In 2012, the cold storage units of building E were halved (18 units), and the usage of the cold storage in building A/B was changed (done as volunteer work). Mawasiliano ya simu 2011 (Imemalizika), Upgrading the internet connection and adopting Sonera cable TV. Kupashajoto 2001 (Imemalizika) Vifuli 2001 (Imemalizika), Upgrading the locking system to Abloy Exec system (exchange lock package). Madirisha 1998 (Imemalizika), Replacement of windows (excluding balcony doors and balcony windows). |
Maeneo ya kawaida | Hifadhi ya vifaa, Sauna, Makao ya uvamizi - hewa, Chumba cha kiufundi, Sela la baridi, Bwawa la kuogelea |
Meneja | REIM Pääkaupunkiseutu Oy. / REIM Espoo |
Maelezo ya mawasiliano ya meneja | Elomaa Pirjo.(pirjo.elomaa@reim.fi) |
Matengenezo | Braleva Kiinteistöpalvelut Oy. |
Eneo la loti | 4773 m² |
Namba ya kuegesha magari | 30 |
Namba ya majengo | 3 |
Eneo la ardhi | Mteremko mzuri |
Barabara | Ndio |
Umiliki wa ardhi | Miliki |
Hali ya kupanga | Mpango yenye Maelezo |
Uhandisi wa manispaa | Maji, Maji taka, Umeme, Inapokanzwa kwa wilaya |
Darasa la cheti cha nishati
Maelezo ya ushirika wa makazi
Jina la shirika ya nyumba | Asunto Oy Aallonharja |
---|---|
Mwaka wa msingi | 1972 |
Namba ya hisa | 6,939 |
Namba ya makao | 45 |
Eneo la makaazi | 3469.5 m² |
Mapato ya kodi kwa mwaka | 11,773.08 |
Haki ya ukombozi | Hapana |
Huduma
Duka ya mboga | 0.5 km |
---|---|
Kituo cha ununuzi | 1.4 km |
Shule | 0.4 km |
Shule ya chekechea | 0.2 km |
Upatikanaji wa usafiri wa umma
mfumo wa reli ya chini ya ardhi | 0.4 km |
---|---|
Basi | 0.1 km |
Ada
Matengenezo | 358.8 € / mwezi (885,241.98 TSh) |
---|---|
Malipo kwa gharama ya kifedha | 552.4 € / mwezi (1,362,897.64 TSh) |
Maji | 12 € / mwezi (29,606.76 TSh) / mtu |
Gharama za ununuzi
Ushuru ya kuhamisha | 1.5 % |
---|---|
Ada ya usajili | € 89 (TSh 219,583) |
Hivi ndivyo ununuzi wa mali yako huanza
- Jaza fomu fupi na tutapanga mkutano
- Mwakilishi wetu atawasiliana nawe bila kuchelewa na kupanga mkutano.
Je! Ungependa kujua zaidi juu ya mali hii?
Asante kwa ombi lako la kuwasiliana. Tutawasiliana nawe mara moja!