Многоэтажный дом, Lintukallionrinne 3
01620 Vantaa, Martinlaakso
A bright top-floor two-bedroom apartment with stunning, unobstructed rooftop views in a building that has undergone a plumbing renovation. The apartment is in good condition: the bathroom was updated during the pipe renewal, and a spacious walk-in closet was completed in 2023. The kitchen has room for a dining table, ensuring comfort and convenience. The building has a low maintenance fee. Excellent location with nearby services, transport links, and outdoor areas. Newly renovated sauna and laundry room in the building. Contact us to book a viewing!
Бездолговая стоимость
179 000 € (19 010 764 ₽)Комнаты
3Спальни
2Ванные комнаты
1Жилая площадь
74.5 м²Основные сведения
Номер листинга | 662302 |
---|---|
Бездолговая стоимость | 179 000 € (19 010 764 ₽) |
Цена | 128 841 € (13 683 626 ₽) |
Долговая составляющая | 50 159 € (5 327 138 ₽) |
Задолженность может быть переведена | Да |
Комнаты | 3 |
Спальни | 2 |
Ванные комнаты | 1 |
Ванные комнаты с туалетом | 1 |
Жилая площадь | 74.5 м² |
Описание жилых помещений | Living room, two bedrooms, kitchen, bathroom, and walk-in closet. |
Описание других пространств | Glazed balcony |
Габариты выверены | Нет |
Основание площади | Устав |
Этаж | 6 |
Количество уровней в квартире | 1 |
Состояние | Хорошее |
Освобождается | 2 months from the transaction / according to the agreement. |
Парковка | Парковочное место, Парковочное место с розеткой |
Помещения |
Ванная комната Гардеробная Гостиная (Запад) Спальня (Запад) Спальня (Восток) Кухня (Восток) Застекленный балкон (Запад) |
Виды | Соседство, Город, Природа |
Склады | Кладовая для одежды, Кладовая/кладовые, Кладовая в подвале |
Телекоммуникации | Кабельное телевидение, Широкополосная связь с сетью Интернет через кабель |
Поверхность пола | Ламинат |
Материалы облицовки стен | Краска |
Отделочные материалы ванной комнаты | Плитка |
Оборудование кухни | Индукционная плита, Холодильник-морозильник, Кухонные шкафы, Кухонная вытяжка, Посудомоечная машина, Отдельная духовка, Микроволновая печь |
Оборудование ванной комнаты | Душ, Подвод воды для стиральной машины, Подогрев пола, Место для стиральной машины, Гигиенический душ для унитаза, Шкафчик в ванной комнате, Кухонная раковина, Душевая стенка, Унитаз, Зеркальный шкаф |
Проверки |
Оценка состояния квартиры, дома
(12 нояб. 2018 г.) Оценка состояния квартиры, дома (27 авг. 2018 г.) Оценка состояния квартиры, дома (16 янв. 2018 г.) |
Обследование на наличие асбеста | Здание построено до 1994 года, и обследование на наличие асбеста не проводилось. |
Акции | 11436 - 11584 |
Описание | 3 rooms, kitchen, bathroom and glazed balcony |
Подробные сведения
Год строительства | 1974 |
---|---|
Год ввода в эксплуатацию | 1974 |
Этажи | 6 |
Лифт | Да |
Тип крыши | Плоская кровля |
Вентиляция | Механическая вытяжная вентиляция |
Категория энергетического сертификата | E, 2013 |
Отопление | Теплофикация |
Строительные материалы | Бетон |
Материал кровли | Толь |
Материал фасада | Бетонные элементы |
Ремонты |
Кровля 2025 (Предстоящее), The board was granted the authority to negotiate the contract, its planning, and supervision. The project is intended to be partially financed with accumulated maintenance fee revenues, and the final decision on the project and its financing will be postponed until at least the next summer season. Clarification negotiations with the bidders are currently upcoming. План реконструкции 2024 (Выполнено), Proposal for a maintenance plan for 2024-2028; please request the plan from the broker. Фасад 2024 (Выполнено), Repairs to the foundation slab. Фасад 2023 (Выполнено), Washing of the facades on the north-facing walls. Замки 2023 (Выполнено), Replacement of the locking system to Abloy Easy. Installation of door lock codes in 2013. Канализация 2023 (Выполнено), Fault points in the pipe relining were repaired through re-lining. In 2015, the underground sewers were renovated using pipe relining. Общие пространства 2023 (Выполнено), Painting of the basement corridor floors. In 2014, an asbestos survey and pipe insulation were carried out in the basement areas Трубопроводы 2022 (Выполнено), Pipeline renovation (so-called traditional) - bathrooms renovated - electrical systems replaced up to the apartment centers - two sauna facilities renovated - stormwater pumping station installed in the unfinished space of the lower floor - ventilation ductwork cleaned and balanced Двор 2021 (Выполнено), Yard area lighting and playground - additional lights installed - wooden furniture in the playground painted. In 2014, partial renovation of the yard was completed Отопление 2019 (Выполнено), Balancing of the heating system + replacement of line valves and radiator thermostats. Парковка 2018 (Выполнено), Patching of the parking lot and painting of the spaces with durable marking material. Прочее 2016 (Выполнено), Replacement of the building automation system to the Ouman automation system |
Помещения в совместном использовании | Склад для спортивного инвентаря, Сауна, Убежище, Сушильная комната, Склад для велосипедов, Кружковая, Холодный подвал, Прачечная |
Управляющий | Martinlaakson Huolto Oy |
Контактные данные управляющего | Esa Mäki p. 09 878 05 215 |
Обслуживание | Huoltoyhtiö |
Площадь земельного участка | 6491.5 м² |
Количество парковочных мест | 76 |
Количество построек | 2 |
Местность | Равнинная местность |
Дорога | Да |
Собственность на землю | Собственный |
Ситуация планирования | Детальный план |
Коммуникации | Водоснабжение, Канализация, Электроснабжение, Теплофикация |
Категория энергетического сертификата
Жилищно-строительный кооператив, детали
Название жилищного кооператива | Asunto Oy Lintukallionrinne 3 |
---|---|
Количество акций | 13 836 |
Количество жилых помещений | 120 |
Площадь жилых помещений | 6918 м² |
Право преимущественной покупки | Нет |
Услуги
Торговый центр | 0.7 км |
---|---|
Школа | 0.2 км |
Детский сад | 0.2 км |
Поликлиника | 1 км |
Доступность на общественном транспорте
Поезд | 0.2 км |
---|---|
Автобус | 0.5 км |
Взнос
Доля эксплуатационных расходов в ежемесячной квартплате | 249,58 € / месяц (26 506,74 руб) |
---|---|
Водоснабжение |
22 € / месяц (2 336,52 руб)
/ лицо Water fee advance, adjustment billing 1-2 times per year |
Кредитная составляющая |
447 € / месяц (47 473,81 руб)
Pipeline renovation loan |
Затраты на приобретение
Налог на переход права собственности |
1,5 %
Paid at the time of the transaction |
---|---|
Комиссия за регистрацию |
89 € (9 452 ₽) According to the fee set by the National Land Survey or the bank's charge |
Так начинается покупка вашей недвижимости
- Заполните короткую форму и мы договоримся о встрече
- Наш представитель незамедлительно свяжется с вами и назначит встречу.
Узнать больше об этом объекте
Благодарим Вас за ваш контактный запрос. Мы свяжемся с Вами в ближайшее время!