Rumah semi terpisah, Österbyntie 40
07370 Pellinki
Please contact the sales representative for further details on this property.
Biaya sewa
1.100 € / month (18.621.451 Rp)Rooms
3Bedrooms
2Bathrooms
1Living area
89.5 m²Contact us
Fill out the rental application for this property in advance.
I am interested in renting this property
Send rental applicationThank you for your contact request. We'll contact you promptly!
Basic details
Listing number | 663944 |
---|---|
Biaya sewa | 1.100 € / month (18.621.451 Rp) |
Masa kontrak | Tak terbatas |
Merokok diperbolehkan | No |
Hewan peliharaan diperbolehkan | No |
Rooms | 3 |
Bedrooms | 2 |
Bathrooms | 1 |
Toilets | 1 |
Bathrooms with toilet | 1 |
Living area | 89.5 m² |
Total area | 95 m² |
Area of other spaces | 5.5 m² |
Measurements verified | No |
Measurements based on | Information given by owner |
Floor | 1 |
Residential floors | 1 |
Condition | Bagus |
Parking | Courtyard parking |
Spaces |
Kitchen Living room Bedroom Bathroom Toilet Den Hall Cellar |
Views | Yard, Neighbourhood, Sea |
Storages | Cabinet |
Permukaan lantai | Lantai vinil |
Wall surfaces | Paint |
Kitchen equipments | Ceramic stove, Freezer refrigerator, Cabinetry, Kitchen hood, Microwave |
Bathroom equipments | Shower, Washing machine, Washing machine connection, Underfloor heating, Cabinet, Sink, Shower wall, Toilet seat, Water boiler, Mirrored cabinet |
Building and property details
Tahun konstruksi | 1920 |
---|---|
Inaugurasi | 1920 |
Lantai | 1 |
Mengangkat | No |
Jenis atap | Gable roof |
Ventilasi | Natural ventilation |
Kelas sertifikat energi | Tidak ada sertifikat energi yang diwajibkan oleh hukum |
Heating | Central water heating, Oil heating |
Bahan bangunan | Kayu, Catatan |
Roof materials | Sheet metal |
Bahan fasad | Pelapis kayu |
Renovations | Other 2024 (Done) |
Property reference number | 638-452-7-1 |
Lot area | 1000 m² |
Number of parking spaces | 2 |
Number of buildings | 1 |
Terrain | Flat |
Road | Yes |
Land ownership | Own |
Planning situation | General plan |
Municipality engineering | Water, Sewer, Electricity |
Biaya
Air | 25 € / month (423.214,8 Rp) / orang |
---|---|
Listrik | 50 € / month (846.429,59 Rp) (memperkirakan) |