Rumah keluarga tunggal, Keskustie 45
07560 Pukkila
Please contact the sales representative for further details on this property.
Harga penjualan
€145.000 (Rp 2.463.332.995)Rooms
5Bedrooms
3Bathrooms
3Living area
90 m²Basic details
Listing number | 663696 |
---|---|
Harga penjualan | €145.000 (Rp 2.463.332.995) |
Rooms | 5 |
Bedrooms | 3 |
Bathrooms | 3 |
Toilets | 3 |
Bathrooms without toilet | 3 |
Living area | 90 m² |
Total area | 260 m² |
Area of other spaces | 170 m² |
Measurements verified | No |
Measurements based on | Information given by owner |
Floor | 2 |
Residential floors | 3 |
Condition | Memuaskan |
Parking | Courtyard parking, Garage |
Features | Boiler |
Spaces |
Kitchen Living room Salon Toilet Hall Bedroom Sauna |
Views | Yard, Backyard, Front yard, Private courtyard, Neighbourhood, Countryside |
Storages | Walk-in closet, Closet/closets, Outdoor storage |
Telecommunications | Antenna |
Permukaan lantai | Kayu |
Wall surfaces | Wall paper, Plank, Paint |
Permukaan kamar mandi | Ubin |
Kitchen equipments | Induction stove, Kitchen hood, Separate oven |
Bathroom equipments | Shower, Underfloor heating |
Inspections | Condition assessment (26 Jan 2022) |
Asbestos survey | The building was built before 1994 and an asbestos survey has not been performed. |
Building and property details
Tahun konstruksi | 1956 |
---|---|
Inaugurasi | 1956 |
Lantai | 3 |
Mengangkat | No |
Jenis atap | Gable roof |
Ventilasi | Natural ventilation |
Kelas sertifikat energi | Tidak ada sertifikat energi yang diwajibkan oleh hukum |
Heating | Central water heating, Oil heating, Furnace or fireplace heating |
Bahan bangunan | Kayu |
Roof materials | Sheet metal |
Bahan fasad | Plester |
Renovations |
Other 2022 (Done) Electricity 2022 (Done) Other 2022 (Done) Ventilation 2022 (Done) Heating 2018 (Done) Heating 2016 (Done) Plinth 2012 (Done) Roof 2010 (Done) Other 2008 (Done) Windows 2005 (Done) Underdrain 2003 (Done) Sewers 2000 (Done) |
Property reference number | 616-402-2-29 |
Lot area | 4826 m² |
Number of parking spaces | 4 |
Number of buildings | 3 |
Terrain | Gentle slope |
Road | Yes |
Land ownership | Own |
Planning situation | Detailed plan |
Municipality engineering | Water, Sewer, Electricity |
Services
Toko kelontong | 0.9 km |
---|---|
TK | 1 km |
Sekolah | 0.6 km |
Sekolah | 15.6 km |
Pusat kesehatan | 0.8 km |
Public transportation access
Bus | 0.1 km |
---|
Biaya
Pemanas | 150 € / month (2.548.275,51 Rp) (memperkirakan) |
---|---|
Listrik | 50 € / month (849.425,17 Rp) (memperkirakan) |
Air | 40 € / month (679.540,14 Rp) (memperkirakan) |
Sampah | 30 € / month (509.655,1 Rp) (memperkirakan) |
Pajak Bumi dan Bangunan | 327,75 € / year (5.567.981,99 Rp) |
Biaya pembelian
Transfer tax | 3 % |
---|---|
Contracts | €160 (Rp 2.718.161) (Estimate) |
This is how the buying of your property starts
- Fill out the short form and we will arrange a meeting
- Our representative will contact you without delay and arrage a meeting.
Would you like to know more about this property?
Thank you for your contact request. We'll contact you promptly!